The task of the project is to improve the Novenco fire fighting system by designing a developed version without the problem of clogging - Noveco Fire Fighting Systems introduction. There have been made two alternative systems which both can eliminate the problem. To choose between the two alternatives I have made a preliminary plan for both cases. The plan consists of the best possible team for developing the new Novenco FF and a plan for how the project will progress. This will be a way to work together and structure the work in the best way which also reduces the cycle of time.

Additionally it is systematic process to move the new fire fighting system through various stages which makes it move from an idea to launch. Choosing the team To choose the best team you have to gather a team consisting of different employees with difference competences and different areas of specialisations. The first thing is to find out which departments the different members of the team should be drawn from and the second is to decide what their expertises should be in the light of tailoring the project team to the project.

Need

essay sample on "Noveco Fire Fighting Systems"

? We will write a cheap essay sample on "Noveco Fire Fighting Systems" specifically for you for only $12.90/page

More Engineering Essay Topics.

In my opinion the two new alternatives are improvements of the original design based on a system error and therefore only needs to be developed. This means it is a new feature which has to be added to the already sold fire fighting systems and in the future just be a part of the Novenco fire fighting system. Project team alternative 1 Alternative 1 is a flushing system. It automatically flushes out the corrosion materials from the pipes by engaging the pump units and the valves. The first I would like is the expertise from suppliers. They have a deeply insight in how their parts of the whole system works or reacts.

Only they know what their parts is consisting of to fully. The next thing to consider is how it can be made. To handle this problem I would gather people who know a lot about technology. This means product development and quality and standards. They should be able to handle everything about how the FF update should be developed in the light of materials, processes and functions. They should moreover be able to come up with solutions to how the system automatically should engage the pump units and the valves. Another department I would gather from would be from global management.

This part in the project would be to lower the costs of the new components and also maintenance. The last man in the team would be from economy. Now I have found a team consisting of an external expertise consultant from the suppliers and I have additionally gathered people from a technology department and global management. The biggest part of the project is the technical. Therefore I have chosen to have both a mechanical and manufacturing engineer. The mechanical engineers job is to make the idea of the new setup into a possible product.

He has to come up with a solution to how every component shall work and how the whole system will work. The manufacturing engineer’s job is to design the whole product, optimize the efficiency of the system and possible also think of the environment. The last persons could possibly be from Global management and manufacturing and an economist. Their job would be to lower the cost of the products, spread our product to different markets in other countries and make supply chains. Project team for alternative 2 The second alternative is quite different. In this solution to the problem the system has got a new nozzle component.

The nozzle is divided into two parts and allows a decoupling of the nozzle head. Then the ship’s crew can clean the nozzle head themselves. The first I would include in my project would be a user. Users often play an important role in innovation because they know how the system is right now and how it could be improved. There is a big difference between knowing the system because you have made it and knowing the system because you have used it in your daily life. Secondly I would as in the first alternative hire people from the technology department. Without the technicians it would not be possible to create the new system.

Technicians who can be a part of the product development phase and also set the standards of how the final product should work. In this case I think it would be important to have someone from Service and parts. The workers have to do the cleaning of the nozzles themselves and therefore needs a good service and parts department. The last person in the team would be a person who could have the total overview of the financials. This means the total crew of alternative two consist of external expertise from the users, technical support from mechanical engineer and a manufacturing ngineer. They nearly have the same purposes as in the first alternative just with the difference of a different system. Another member of the project team is from service and parts. His expertise would be mounting of the system, solving possible errors of the new system and guidance in using the system in the best way. The last member would be an economist. The stage gate model A stage gate system is a project management tool with the goal of quality. The stage gate system focuses on eliminating errors and improving business processes.

It gives a more systematic approach to how a firm should develop and launch new products. The stage gate model is seen above consisting of 5 stages and 5 gates. The five stages are designed to gather the needed information to move the project to the next decision point. The gates work as a go further or kill points. They serve a quality control and make the path to the next stage by connecting the different stages. Each gate has its own criteria’s which has to be fulfilled before passing to the next stage. I have chosen to use the same stages and gates for both alternatives but with different activities.

I have omitted to use the first stage and gate. This is due to the investigation and idea has already been made by finding the problem of the system and making an alternative solution. Main gates and stages for alternative 1 Gate In this gate the potential of the project is evaluated. The team also has to make a list of must meet criteria’s. This is a list of objectives the new FF system has to fulfil to be successful. When this is done the new team can begin with the first stage. Detailed investigation In this stage the new team has to determine the technical objectives of the project.

This includes a research of the potential of the new system and finding user needs for the new Novenco FF. The next thing is to make a plan of the project. How long will it take before it is done, what will it cost and what are the routes to have it done. Additionally the team has to make a delineation of the project and look at their competitors. This stage can possible be done by the supplier and the person from Global management and manufacturing. Gate In this gate the economist has to evaluate financial commitment regarding the development. This includes research concerning the possibility of making the new system in the current factory.

The team also has to evaluate all the activities made until now. Everything has to be evaluated by the full team before continuing to the development stage. Development In this stage the mechanical engineer and the manufacturing engineer has a major influence. The system of the new alternative has to be constructed and test has to be made ensuring the new system meets all requirements. In the end of this stage the engineers have to have made a prototype of the automatically flushing system. The rest of the team have to make operation activities. This includes feedback of the customers and market launch plans.

Gate In this gate the GMM engineer has to make a research of the continuing attractiveness of the new Fire fighting system. The economist has to make an updated financial plan in the light of the new prototype and the engineers have to make review of their work in the development stage. Testing In the testing stage the economist, supplier and the GMM validate the viability of the project. This includes a financial account of the manufacturing process, checking the attractiveness of their new system, field trials of the product, get new customers. Gate This is the final gate before market launch.

The team has to evaluate all results from the testing stage to get a total overview of the new system and decide if it is profitable to launch it. Launch This is the final stage in the stage gate process. It is here the team launches their final product. The team implement their marketing and production plan to give the new fire fighting system the best start on the market as possible. At some point the project must be terminated due to the new system has become a regular part of the fire fighting system. Main gates and stages for alternative 2 Gate The must-meet objectives are being made by the whole team.

This can e. g. be low price, long life time and user-friendliness. The user experience can be an important factor in finding a user friendly system. This is very relevant in this case where the users have to operate the system themselves. Detailed investigation Here in the first stage the team has to determine the business case. And find out how their system shall be different and how it shall be attractive. This stage is all about finding the costumers need. In the light of this and the problem of the old system the “user consultant” and the two engineers can get an overview of how the new product shall be.

The economist also needs to make investigation of the financial budget. Gate This gate is about using all the information from the first gate and stage and the must meet criteria’s. Everything has to be summed up before developing the project, so it the project will fulfil every all requirements. This is a task for the entire team. Development This stage makes the idea of the product into reality. It is in this phase the two engineers manufacture the divided nozzle head. All requirements has to be fulfilled, this is where the person from service and parts also has a major influence.

His job is among other things to have the total overview of the system and its function. When the prototype of the new nozzle head has been made, a lot of tests have to be made to secure the quality and standards of the final product. Gate This gate compiles all lose ends and review the progress of the project. The phase makes sure that the project is headed in the right way, completed in a quality fashion way and is consistent with the original idea. Testing The testing stage is a part of this stage gate process because it can test the viability of the project.

The project itself will be validated by the external user consultant and by a pretesting the market. The economist also has to make test. His job is to make a financial analysis and to check the continued business and economic viability. Gate It is at this point the product is prepared to be launched. All unforeseen events have to be found and solved so the product is ready to be sold and mounted. Launch This is where the project ends and the final product is launched. All the must-meet objectives have been fulfilled and the product has solved the problem of the system clogging due to corrosion materials in the water pipes.